<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>aBlog by Reward &#187; Sound rating</title>
	<atom:link href="http://blog.rewardwalls.com/tag/sound-rating/feed/" rel="self" type="application/rss+xml" />
	<link>http://blog.rewardwalls.com</link>
	<description>Keeping you up to date on green building trends and Insulated Concrete Forms</description>
	<lastBuildDate>Wed, 01 Feb 2012 16:21:17 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1.3</generator>
		<item>
		<title>Frank Theatres Finished!</title>
		<link>http://blog.rewardwalls.com/frankstheatre3/</link>
		<comments>http://blog.rewardwalls.com/frankstheatre3/#comments</comments>
		<pubDate>Thu, 09 Sep 2010 15:46:05 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Showcase]]></category>
		<category><![CDATA[Darryl U]]></category>
		<category><![CDATA[PA]]></category>
		<category><![CDATA[Sound rating]]></category>
		<category><![CDATA[theater]]></category>
		<category><![CDATA[Tom R.]]></category>

		<guid isPermaLink="false">http://blog.rewardwalls.com/?p=2206</guid>
		<description><![CDATA[We have documented the ICF Construction of Frank Theatres Queensgate in York, PA over the course of the last 8 months or so, and back in May they had their official Grand Opening celebration for the new state of the art theater! Be sure to check out the first post on the initial construction of [...]]]></description>
			<content:encoded><![CDATA[<p>We have documented the ICF Construction of <a href="http://www.franktheatres.com/index.html">Frank Theatres Queensgate</a> in York, PA over the course of the last 8 months or so, and back in May they had their official Grand Opening celebration for the new state of the art theater! Be sure to check out the first post on the initial construction of <a href="http://blog.rewardwalls.com/frankstheatre1" target="_self">Frank&#8217;s insulating concrete forms</a> and the second post showing the <a title="ICF Installation" href="http://blog.rewardwalls.com/frankstheatre2">insulating concrete forms installed</a>. All people involved in this project, including the owners, are extremely happy on how their theater turned out.</p>
<h2>Summary of ICF Movie Theater</h2>
<p>This 13-plex movie theater was completed in about 10 months. The 13-Plex was able to stay on schedule and was ready in time for the scheduled Grand Opening. STC testing was done on-site to show the soundproofing properties that the owner was looking for.</p>
<p><strong>Features and Facts:</strong></p>
<ul>
<li>210,000 total square feet</li>
<li>72,000 square feet of ICF wall</li>
<li>36-foot above grade walls</li>
<li>ICF exterior and demising walls</li>
<li>13&#8243; insulated concrete forms with ledge form- iForm</li>
<li>Brick and TAFS exterior</li>
<li><a href="http://www.constructionsupplycenters.com" target="_blank">ICF Distributor</a>: Construction Supply Center</li>
<li>Architect: ADW Architects</li>
<li>General Contractor: Warfel Construction</li>
<li>ICF Installer: Rubright Construction</li>
</ul>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2010/09/100_3824crop.jpg"><img class="alignnone size-large wp-image-2212" title="Frank Theaters York, PA" src="http://blog.rewardwalls.com/wp-content/uploads/2010/09/100_3824crop-1024x480.jpg" alt="Frank Theaters York, PA" width="722" height="338" /></a></p>
<p><a href="../wp-content/uploads/2010/09/100_3818crop.jpg"><img class="alignnone size-large wp-image-2214" title="ICF Theater Queensgate Town Center" src="../wp-content/uploads/2010/09/100_3818crop-1024x436.jpg" alt="ICF Theater Queensgate Town Center" width="720" height="306" /></a></p>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2010/09/100_3818crop.jpg"></a><a href="http://blog.rewardwalls.com/wp-content/uploads/2010/09/DSC_0420crop.jpg"><img class="alignnone size-large wp-image-2213" title="Queensgate Theater made with ICFs" src="http://blog.rewardwalls.com/wp-content/uploads/2010/09/DSC_0420crop-1023x493.jpg" alt="Queensgate Theater made with ICFs" width="720" height="346" /></a></p>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2010/09/100_3820crop.jpg"><img class="alignnone size-large wp-image-2215" title="Franks Theatre PA" src="http://blog.rewardwalls.com/wp-content/uploads/2010/09/100_3820crop-1024x529.jpg" alt="Franks Theatre PA" width="715" height="369" /></a></p>
<p>There you have it folks! We have a couple more theaters around the country we have done and have a few more in the works as well. Be sure to check out our <a href="http://www.rewardwalls.com/insulated-concrete-forms-gallery/" target="_self">insulating concrete form gallery</a> of projects to see the versatility of Reward ICF wall systems!</p>
<p><a href="../wp-content/uploads/2009/11/iForm_Overview09_Page_1.jpg" target="_blank"><img title="New Standards for Sustainability? We're already there." src="../wp-content/uploads/2009/11/tagline.jpg" alt="New Standards for Sustainability? We're already there." width="717" height="43" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://blog.rewardwalls.com/frankstheatre3/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Frank&#8217;s Theatre in York, PA</title>
		<link>http://blog.rewardwalls.com/frankstheatre1/</link>
		<comments>http://blog.rewardwalls.com/frankstheatre1/#comments</comments>
		<pubDate>Tue, 13 Oct 2009 15:02:23 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Showcase]]></category>
		<category><![CDATA[Dar]]></category>
		<category><![CDATA[Darryl U]]></category>
		<category><![CDATA[PA]]></category>
		<category><![CDATA[sound]]></category>
		<category><![CDATA[Sound rating]]></category>
		<category><![CDATA[theater]]></category>
		<category><![CDATA[theatre]]></category>
		<category><![CDATA[tom reilly]]></category>

		<guid isPermaLink="false">http://blog.rewardwalls.com/?p=969</guid>
		<description><![CDATA[One application where ICF’s are seeing both increased interest and use is in multiplex movie theaters.  The sound attenuation qualities of an ICF wall assembly are outstanding; a perfect application for movie theaters.  We’ve all been to those old theaters where you can actually hear the movie next door.  Very annoying.  ICF wall assemblies help [...]]]></description>
			<content:encoded><![CDATA[<p>One application where ICF’s are seeing both increased interest and use is in multiplex movie theaters.  The sound attenuation qualities of an ICF wall assembly are outstanding; a perfect application for movie theaters.  We’ve all been to those old theaters where you can actually hear the movie next door.  Very annoying.  ICF wall assemblies help to prevent that from being an issue, and it’s getting the attention of theater owners and patrons alike.</p>
<p>In York, PA, <a href="http://www.franktheatres.com/" target="_blank">Frank Theatres</a> has a 13-plex theatre under construction.  Originally slated to start construction in the spring, the project finally got under way earlier this summer.</p>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-013crop.jpg"></a><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-013crop.jpg"><img class="alignnone size-large wp-image-972" title="Franks Theatre York, Reward Wall Systems" src="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-013crop-1024x801.jpg" alt="Franks Theatre York, Reward Wall Systems" width="327" height="254" /></a><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-002crop.jpg"><img class="alignnone size-large wp-image-973" style="margin-left: 1px; " title="Franks Theatre York, Reward Wall Systems" src="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-002crop-1024x996.jpg" alt="Franks Theatre York, Reward Wall Systems" width="261" height="254" /></a><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-013crop.jpg"><br />
</a></p>
<p>Designed by Tom Burdick of <a title="ADW Architects" href="http://www.adwarchitects.com/" target="_blank">ADW Architects</a> in North Carolina, this project has over 72,000 square feet of ICF wall, with some of the walls reaching 36’ in total height.  The entire perimeter of the building, along with the separation walls between each theater, uses Reward’s 13” iForm.  The building will have a combination brick/TAFS exterior. Also the design team took advantage of Reward’s ledge form, which provides a 4 ½” ledge for application of the brick veneer while maintaining a fully insulated wall assembly.</p>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-010.jpg"><img class="alignnone size-large wp-image-974" title="Franks Theatre York, Reward Wall Systems, Ledge" src="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Franks-Theatre-YorkPA-6-17-09-010-1024x768.jpg" alt="Franks Theatre York, Reward Wall Systems, Ledge" width="497" height="370" /></a></p>
<p>The contractor performing the install, Rubright Construction in Shoemakerville, PA, settled on Reward not only because of the competitive pricing but because of the depth and breadth of support services offered from Reward and its exclusive distributor, <a title="CSC, Construction Supply Center" href="http://www.constructionsupplycenters.com/" target="_blank">Construction Supply Centers of New Holland Concrete</a> (CSC.) in New Holland, PA. The Reward/CSC team has worked closely with the architect during the design phase, and has been an integral part of the construction process.  Reward sent its Field Application Specialist, <a title="Darryl U" href="http://blog.rewardwalls.com/common-misconceptions/" target="_self">Darryl U</a>, to work with Rubright during the start of construction.  Darryl helped Rubright, who had no previous ICF experience, learn the “ins and outs” of working with Reward ICFs.  Darryl assisted in training Rubright’s crew, helping to improve their overall efficiencies.</p>
<p>“Darryl has been great to work with,” noted Todd Moore, Project Manager with Rubright.  “He’s a real source of knowledge and information.  He taught us a lot when he was here, and he’s been easy to reach on the phone when I have questions.”</p>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Frank-Theatres-7-23-09-025.jpg"><img class="alignnone size-large wp-image-976" title="Franks Theatre York, Reward Wall Systems, Tall Wall" src="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Frank-Theatres-7-23-09-025-1024x768.jpg" alt="Franks Theatre York, Reward Wall Systems, Tall Wall" width="562" height="421" /></a></p>
<p><a href="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Frank-Theatres-7-23-09-046.jpg"><img class="alignnone size-large wp-image-977" title="Franks Theatre York, Reward Wall Systems" src="http://blog.rewardwalls.com/wp-content/uploads/2009/10/Frank-Theatres-7-23-09-046-1024x768.jpg" alt="Franks Theatre York, Reward Wall Systems" width="558" height="419" /></a></p>
<p>CSC has provided almost daily support to the Rubright crew, providing material for the project on a tight schedule, and visiting several times a week to address questions and monitor progress.  Chris Perez, Sales Representative with CSC, has maintained close contact with Rubright, providing both technical and field information as needed.</p>
<p>Rubright has made significant progress in constructing the walls for the project so farm and the GC for the project, <a title="Warfel Construction, Franks" href="http://www.warfelconst.com/portfolio_current_franks_theatres.html" target="_blank">Warfel Construction</a> in Lancaster, PA, has been pleased with the progress.  The delay in starting construction has put a time crunch on the project but they are quickly moving forward.  As more trades are integrated into the construction phase, I will update this blog with information on how other subs (electricians, plumbers, etc.,) are faring. See the update on the <a href="http://blog.rewardwalls.com/frankstheatre2">ICF Construction</a> of this theater</p>
<p><em>-Article Submitted by Tom Reilly, Reward RSM Northeast US</em></p>
<p><span style="font-family: 'Clarendon BT'; color: #56ab2e; font-size: 16pt;"><span style="color: #99cc00;"><a href="../wp-content/uploads/2009/06/SustainAdHandout.jpg" target="_blank">The New Standard of Sustainability.</a></span> Tell the World.</span></p>
<p><span style="font-family: 'Clarendon BT'; color: #56ab2e; font-size: 16pt;"><br />
</span></p>
]]></content:encoded>
			<wfw:commentRss>http://blog.rewardwalls.com/frankstheatre1/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>TimberLake Lodge</title>
		<link>http://blog.rewardwalls.com/timberlake-lodge/</link>
		<comments>http://blog.rewardwalls.com/timberlake-lodge/#comments</comments>
		<pubDate>Thu, 17 Sep 2009 14:54:12 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Showcase]]></category>
		<category><![CDATA[Cemstone]]></category>
		<category><![CDATA[Hotel]]></category>
		<category><![CDATA[ICF Construction]]></category>
		<category><![CDATA[Minnesota]]></category>
		<category><![CDATA[Sound rating]]></category>
		<category><![CDATA[STC]]></category>

		<guid isPermaLink="false">http://blog.rewardwalls.com/?p=839</guid>
		<description><![CDATA[Project Timberlake Lodge Grand Rapids, Minnesota Overview Timberlake Lodge, a destination hotel, in Grand Rapids built this 84-room, 3-story hotel with full amenities including a banquet hall, a large pool and sauna entertainment area, and full restaurant and bar. The main reason for choosing Reward ICF’s was to accelerate the building schedule. With reducing material [...]]]></description>
			<content:encoded><![CDATA[<h2>Project</h2>
<p>Timberlake Lodge</p>
<p>Grand Rapids, Minnesota</p>
<h2>Overview</h2>
<p>Timberlake Lodge, a destination hotel, in Grand Rapids built this 84-room, 3-story hotel with full amenities including a banquet hall, a large pool and sauna entertainment area, and full restaurant and bar.</p>
<p>The main reason for choosing Reward ICF’s was to accelerate the building schedule. With reducing material lead time, early occupancy was accomplished. Early occupancy, meant making money quicker for the owner.</p>
<p>Also by using Reward ICF’s for the interior partition walls they were able to use them as bearing walls for Hollow Core plank, experience increases in fire rating (4 hours), and demand a higher STC rating to improve guest experience.</p>
<p>No more staying the night and hearing the &#8220;argument&#8221; of the vacationing couple next door, or the partying of the fraternity group down the hall! ICFs are ideal for hotel and condo guest experience because of their ability to sound proof.</p>
<h2>Challenges and Unique Install Techniques</h2>
<p>For building the pool room ICFs were chosen for their mold resistant properties and ICF construction was able to continue through the winter without interruption.</p>
<p>Gable roof framing was also easily cutout and poured using Reward ICF’s and overall they were versatile enough for tall wall construction of 20’ to 54’ high.</p>

<a href='http://blog.rewardwalls.com/timberlake-lodge/kuepers-timberlodge-setting-precast-plank1/' title=' Setting Precast Plank1'><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/Kuepers-Timberlodge-Setting-Precast-Plank1-150x150.jpg" class="attachment-thumbnail" alt="Setting Precast Plank1" title="Setting Precast Plank1" /></a>
<a href='http://blog.rewardwalls.com/timberlake-lodge/kuepers-corners-rebar-cage-cutting-ties-pre-brace/' title=' rebar cage - cutting ties- pre brace'><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/Kuepers-Corners-rebar-cage-cutting-ties-pre-brace-150x150.jpg" class="attachment-thumbnail" alt="rebar cage - cutting ties- pre brace" title="rebar cage - cutting ties- pre brace" /></a>
<a href='http://blog.rewardwalls.com/timberlake-lodge/kuepers-post-tension-slab-transition/' title='Post tension slab transition'><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/Kuepers-Post-tension-slab-transition-150x150.jpg" class="attachment-thumbnail" alt="Post tension slab transition" title="Post tension slab transition" /></a>
<a href='http://blog.rewardwalls.com/timberlake-lodge/kuepers-timberlodge-look-down-hall-room-partition/' title='look down hall - room partition'><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/Kuepers-Timberlodge-look-down-hall-room-partition-150x150.jpg" class="attachment-thumbnail" alt="look down hall - room partition" title="look down hall - room partition" /></a>
<a href='http://blog.rewardwalls.com/timberlake-lodge/kuepers-timberlake-lodge-site-view-nove-18/' title=' site view nove 18'><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/Kuepers-Timberlake-Lodge-site-view-nove-18-150x150.jpg" class="attachment-thumbnail" alt="site view nove 18" title="site view nove 18" /></a>
<a href='http://blog.rewardwalls.com/timberlake-lodge/timberlake-126-small/' title='TIMBERLAKE  '><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/TIMBERLAKE-126-small-150x150.jpg" class="attachment-thumbnail" alt="TIMBERLAKE" title="TIMBERLAKE" /></a>
<a href='http://blog.rewardwalls.com/timberlake-lodge/timberlake-123-small/' title='TIMBERLAKE '><img width="150" height="150" src="http://blog.rewardwalls.com/wp-content/uploads/2009/09/TIMBERLAKE-123-small-150x150.jpg" class="attachment-thumbnail" alt="TIMBERLAKE" title="TIMBERLAKE" /></a>

<h1>Project Specs</h1>
<h2>42,640 Sq. Ft. of  ICF wall</h2>
<h2>8,000 Reward Forms</h2>
<h2>Fiber Cement Board Siding</h2>
<h2>PreCast/Hollow-Core Plank Floors</h2>
<h2>All Interior Partition Walls</h2>
<h2>13” iForm = 8” poured concrete</h2>
]]></content:encoded>
			<wfw:commentRss>http://blog.rewardwalls.com/timberlake-lodge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

